Post by Corey on Jan 20, 2010 9:38:07 GMT -8
We will be having one of MANY work party's this weekend. Remember every time you show up to a work party and WORK, your name gets put in a drawing for a free Club race entry.
Work will start at 9:30 each day and should be done about 3:00 unless we are in the middle of something and on a good roll
So far we have accomplished a lot out there getting things ready for a great 2010 Club season and our 2010 4 Cycle Sprint and Shifter Grand Nationals.
Here is a list of the things we would like to get done this weekend:
Repair the roof on the covered spectator area
Repair and install new sprinklers along the front straight
Install new sod in different areas around the track
Clean up and get the areas of the asphalt we had to cut ready to repave in the pit area
Clean out and get the hole around the water and electrical service in pit 26? ready for concrete
Continue the conduit from front straight wall to the tower
Install new tops on the benches for the Tech shed
Install the new lights in the Tech shed
Build the new gate between the Scale house and Tech shed
Clean the fence lines of all tumble weeds and other garbage that has blown in.
As normal I am sure there are several things that are not coming to mind right now and will need to be added. So come on out and give us all a hand in getting all of this done.
Thanks for all the support Corey
|
|